拆模工作应有安全施工措施并应确定拆除及运输方法

拆模工作应有安全施工措施并应确定拆除及运输方法
2023年02月11日20:27:06 0 579

拆模应采取安全施工措施,确定拆模运输方法

打桩

4.1.2.1打桩机在安装、拆卸和操作过程中,作业现场应用旗绳围挡。严禁非工作人员进入,遇六级以上大风应停止工作。

4.1.2.2桩帽和衬垫必须与桩型、桩架和桩锤兼容。如有损坏,应及时修理或更换。

4.2.1模板

4.2.1.1总则

c) 高处模板的安装和拆除必须符合高处作业的有关规定。工作人员上下木梯,不得攀爬模板或支架。严禁在独木或悬模上行走。

d) 结构高度高、复杂的模板安装、拆除,应制定安全技术措施。

模板安装

(a)模板顶部支撑应为竖直,底端应为平的,用木料填充,木楔应牢牢钉牢,支撑必须用横杆和十字撑来固定,支撑处的地基必须牢固,并严格防止支撑下沉和倾倒。

b) 安装4m以上的柱模时,周围必须固定牢固。作业时应搭设临时工作平台。安装独立梁模板时,不得站在柱模板上或在梁底模板上行走。

c) 采用钢管脚手架作模板支撑时,必须进行计算,每根立柱的荷载不得大于2T,立柱上必须设置水平拉杆和横撑。

4.2.1.3拆模

a) 拆模应符合下列规定:

1) 拆模应采取安全施工措施,确定拆模运输方式。

2) 高处拆模应划定警戒范围。

4) 拆模应按顺序分段进行。严禁大面积撬、砸、撬、拉。

7) 严禁从高处撬下模板,用绳索吊下或用溜槽(轨)滑下。溜槽(轨)周围不小于5m的位置,应设危险标志和旗绳,并设专人监护。


Safety construction measures shall be taken for formwork removal, and the method of removal and transportation shall be determined

piling

4.1.2.1 during the installation, disassembly and operation of the pile driver, the working site shall be fenced with flag rope. Non working personnel are strictly prohibited to enter, and the work shall be stopped in case of gale above level 6.

4.1.2.2 pile cap and liner must be compatible with pile type, pile frame and pile hammer. If there is any damage, it should be repaired or replaced in time.

4.2.1 formwork

4.2.1.1 general provisions

c) The installation and removal of formwork at height must comply with the relevant regulations of work at height. The staff shall go up and down the wooden ladder, and shall not climb on the formwork or support. It is strictly forbidden to walk on the single wood or suspended formwork.

d) Safety technical measures shall be formulated for the installation and removal of formwork with high and complex structure.

Template installation

a) The top support of the formwork shall be vertical, the bottom end shall be flat and padded with wood, the wood wedge shall be nailed firmly, the support must be fixed with cross bar and cross bracing, the foundation at the support must be solid, and the support sinking and dumping shall be strictly prevented.

b) When erecting the column formwork of more than 4m, the surrounding must be fixed firmly. Temporary working platform shall be set up during operation. When erecting the independent beam formwork, it is not allowed to stand on the column formwork or walk on the bottom formwork of the beam.

c) When steel pipe scaffold is used as formwork support, it must be calculated, and the load of each column shall not be greater than 2T. The column must be equipped with horizontal pull rod and cross bracing.

4.2.1.3 formwork removal

a) Formwork removal shall comply with the following provisions:

1) Safety construction measures shall be taken for formwork removal, and the method of removal and transportation shall be determined.

2) The warning range should be delimited when removing formwork at high place.

4) The removal of formwork shall be carried out in sections in sequence. It is strictly forbidden to pry, smash, pry or pull down in large area.

7) It is strictly forbidden to pry down the formwork from high place, and it shall be lifted down by rope or slide down by chute (rail). The position not less than 5m around the chute (rail) shall be surrounded by danger sign and flag rope and supervised by special personnel.


拆模工作应有安全施工措施并应确定拆除及运输方法

 

打桩

4.1.2.1  打桩机在安装、拆卸及运行时,其工作现场应用标志旗绳围栏,严禁非工作人员进入,遇六级以上大风应停止工作。

4.1.2.2  桩帽与衬垫必须与桩型、桩架、桩锤相适应。如有损坏,则应及时整修或更换。

4.2.1  模板工程

4.2.1.1  一般规定

c)在高处安装与拆除模板必须遵守高处作业的有关规定。工作人员应从木梯上下,不得在模板、支撑上攀登。严禁在高处独木或悬吊式模板上行走。

    d)高处、复杂结构模板的安装及拆除工作应制定安全技术措施。

4.2.1.2  模板安装

    a)模板顶撑应垂直,底端应平整并加垫木,木楔应钉牢,支撑必须用横杆和剪刀撑固定,支撑处地基必须坚实,严防支撑下沉、倾倒。

    b)支设4m以上立柱模板时,其四周必须固定牢固。操作时应搭设临时工作台。支设独立梁模板时,不得站在柱模上操作或在梁的底模上行走。

    c)采用钢管脚手架兼作模板支撑时必须经过计算,每根立柱的荷载不得大于2t。立柱必须设水平拉杆及剪刀撑。

4.2.1.3  模板拆除

    a)模板拆除应遵守下列规定:

     1)拆模工作应有安全施工措施并应确定拆除及运输方法。

2)高处拆模应划定警戒范围。

     4)拆除模板应按顺序分段进行。严禁猛撬、硬砸及大面积撬落或拉倒。

7)拆除模板严禁高处撬落,应用绳索吊下或由滑槽(轨)滑下。滑槽(轨)周围不小于5m处应用危险标志旗绳围住并设专人监护。

厂家电话:4000038122(点击拨打)

最新报价:13966784488(微信同号)

点赞(0) 打赏
weinxin
投诉&咨询
文章名+链接地址,发送到此微信:tourism52
靠谱的,pv,电力,公司有,哪些 管件管材

靠谱的cpvc电力管公司有哪些呢?

靠谱的cpvc电力管公司有哪些呢?【概要描述】最近有很多用户在网上去咨询靠谱的cpvc电力管公司有哪些呢?在看到这个问题的时候,我们觉得也是很有必要为大家讲述一下的。如果你对这个问...
pe,管材,生产线,性能,优点 管件管材

PE管材生产线的性能和优点

PE管材生产线的性能和优点关键字:钢带增强聚乙烯螺旋波纹管        PE管材生产线其结构独特,自动化程度高,操作方便、连续生产稳定可靠。该生产线...
mpp,电力,管的,作用 管件管材

MPP电力管的作用?

烟台MPP电力管是采用了改性的聚丙烯材料,它是可以祛除因传统的施工所造成的的尘土和交通阻塞的扰民等因素,它有一个很强的因素是耐腐蚀,绝缘性很好,不易老化,施工很轻便等特点。烟台MP...
中源,管业,pv,电力,套管 管件管材

中源管业PVC-C电力套管

“中源管业”管道专家PVC-C电力套管PVC-C电力套管产品概述CPVC高电压保护管具有耐腐蚀、耐酸、碱、盐等化学溶剂腐蚀,遇油脂也不开裂,强度高、阻燃、抑烟、耐热、使用寿命长,C...

评论列表 共有 0 条评论

暂无评论