Construction and installation engineering subcontract

General contractor (Party A):

Address: Postal Code Telephone

Legal representative: position

Subcontractor (Party B):

Address: Postal Code Telephone

Legal representative: position

In accordance with the "Contract Law of the People's Republic of China", the "Measures for the Implementation of the General Subcontracting of Construction and Installation Projects" of the Ministry of Construction and the relevant provisions of the XX Document of the People's Government of the XX Municipality, this contract was signed by both parties and was strictly implemented.

Article 1 Project

First, the project name:

Second, the project location:

Third, the project number: Construction license number: _ business license number:

4. Subcontracted project scope and engineering volume (with budget)

V. The term of the subcontracted project starts on the day of the month and is completed on the day of the month.

6. Labor costs of subcontracted projects.

7. Party B enters the types of work and the number of people.

Article 2 Project settlement

According to the subcontracted project, the first month's advance living expenses will be calculated according to the number of contractors, and will be deducted at the next month's settlement. The project will be pre-contracted according to the acceptance of the project completed during the construction period (the extent must not exceed the completed amount). 80%) After the project is completed, it will be checked and accepted by both parties.

Article 3 Project Quality

Party A shall carry out technical disclosure and organization acceptance according to the national quality acceptance specifications and assessment standards. Party B shall carefully organize the construction according to the requirements of the construction drawings and specifications to ensure the quality of the project. If the quality is not up to standard, it must be reworked and repaired, and the loss of materials and materials shall be borne by Party B. If the quality of the project is inferior and cannot be saved, Party B shall be responsible for compensating for the loss of all materials.

Article 4 Safety Production

1. Party A shall make a safe disclosure of the project undertaken by Party B, put forward clear safety requirements, and conduct supervision and inspection. Party B must conscientiously implement the rules and regulations concerning safety construction, strictly abide by the safe operation procedures, and provide safe production facilities to Party A. Party B can only use it after passing the inspection. If there is any casualty accident during the construction due to violation of the above regulations, Party B shall be responsible for the loss.

2. Labor protection articles and live operating devices used by individuals, such as insulating gloves and rubber boots, shall be resolved by Party B. If Party B does have difficulties, it may propose a plan for use and Party A shall assist in the settlement.

3. In the course of construction, Party B shall be responsible for the fire accident caused by Party B's violation of fire regulations and regulations.

Article 5 Life Management

1. After Party B's workers enter the scene, the accommodation and food problems will be provided by Party A and the main cooking utensils (cauldrons, cages, hair dryers, large panels) shall be kept by Party B. If there is damage, the compensation will be compensated. The small scattered appliances are provided by Party B, and the domestic coal is provided by Party A in a quantitative amount.

2. The food and oil used for daily life shall be provided by Party B. Party A shall provide convenience in medical and health care. If Party B's workers have illness, they may seek medical treatment from Party A with the approval of their responsible person. The medical expenses shall be paid by Party B. Responsible for paying monthly.

Article 6 Unit price of subcontracted labor costs

1. Subcontracting of unit projects, each budgeted working day is yuan. The implementation of unilateral square meters of labor costs, per square meter.

Second, the internal plastering and subcontracting, to achieve high quality every working day of the yuan. The eligible cost per working day is RMB. A separate labor cost is applied for each square meter.

3. Each budgeted workday for a single sub-container and earthwork is yuan.

4. Every day of work is cleared.

5. All-day shutdowns, materials waiting, water cuts, power cuts, and clearing work days are yuan.

6. Water, electricity, heating, and sanitation projects, each budgeted workday (subcontracted by building number).

7. During the winter construction period (from December 1 to the end of February), the working day will be reduced by 10%. The unit price for the workday is yuan.

Eight, subcontracted project cost schedule (one to seven items can be listed)

Article 7 Material Supply Management

Party B shall set up a special person to handle the limit collection procedures for cement, steel, commodity components, hardware, linoleum, asphalt and special materials for water, electricity, heating and sanitation. Party B shall strictly follow the quality requirements and materials provided by Party A for construction. Party B shall bear the waste of materials used in the construction of Party B and the unreasonable excess of the quota. Party B shall use the materials according to the 垛 (heap) during the construction, so that the daily use will be cleared, the materials will be cleaned, and the site will be kept clean.

Article 8 Construction Machinery

First, the large-scale tools are the responsibility of Party A to ensure the use of the need.

Second, the manual operation tool is responsible for Party B.

3. Party B shall take care of the equipment that Party A is responsible for, and Party B shall be responsible for compensation if there is any loss.

4. The medium and small-sized machinery required for construction shall be equipped by Party A according to the construction plan. One machine shall be equipped with a driver to ensure the normal construction of Party B. Party B shall not allow unauthorized operation of the equipment (with its own machinery in accordance with relevant regulations).

Article 9 Site Management

1. Personnel of Party A and Party B shall strictly abide by the various management systems on the site and organize the construction under the unified leadership of Party A's on-site personnel. The two parties involved in the plan, schedule, and material supply shall cooperate closely to ensure smooth construction.

2. Party B shall educate construction personnel on compliance with laws and regulations, safety production and property protection, and designate special personnel to be responsible for on-site security work. It is strictly forbidden to steal on-site materials. If there is any illegal behavior in violation of the on-site management system, Party A has the right to take necessary Party B shall bear legal responsibility and be responsible for compensation for economic losses.

Third, the subcontractors should be relatively stable. Work signs should be worn at the construction site. Persons outside the contract are not allowed to enter and leave the site.

Article 10 Liability for breach of contract

1. Projects subcontracted by Party B shall not be subcontracted. In the course of construction, the inspection fails to meet the national acceptance specifications, and the quality of the project cannot be guaranteed. Party A has the right to terminate the contract and cause losses of rework, and Party B shall compensate.

2. After the contract is signed, neither party may arbitrarily change or cancel it without the consent of both parties. If Party B fails to cancel the contract unilaterally without Party A's consent, Party B shall compensate Party A for the economic losses caused by Party A's impact on the construction plan; if Party A cancels the contract midway, it shall compensate Party B for the economic losses caused thereby.

3. Party B must complete the construction period and quality requirements as stipulated in the contract. Otherwise, each time overdue, Party A shall reimburse Party A for overdue liquidated damages of _7% of the labor cost of the subcontracted project.

4. Party A and Party B shall not owe all kinds of payables for any reason, such as defaulting on non-payment, and repaying the default payment of overdue payment according to the bank's short-term loan interest rate.

Article 11 Supplementary Provisions

1. In the event of a dispute in this contract, both parties shall consult in time and the negotiation will not be completed. If it cannot be solved, it can be solved according to the following item (): (1) Applying for arbitration to the Economic Contract Arbitration Committee of the building where it is located, and (2) Prosecuting to the People's Court.

2. In the first instance of this contract, both parties shall hold one copy. The remaining copies are submitted for filing.

3. If it is required for forensic (notarization), it may go to the district or county administration for industry and commerce at the location where the building is located for notarization or notarization.

4. Other terms agreed by the parties:

1.

2.

Article 12 Contract attachments and validity period

First, the contract annex:

                                                                                           

1. Project budget book;

2.

2. This contract shall become effective from the date of the seal of both parties, and shall expire after the completion of the project and settlement.

Total package unit: ________________________

Legal representative: ______________________

       year month day

Subcontracting unit: ________________________

Legal representative: ______________________

       year month day

点赞(0) 打赏

评论列表 共有 0 条评论

暂无评论

热门产品

高职单招合作协议书|高职单招合作协议,高职单招合作协议书,高职合作协议,单招合作协议,高职单招合作合同,高职,单招,合作,协议书
高职单招合作协议书
第三方非代收货款货物运输合同模板|货物运输合同,货物运输合同模板,第三方,代收,货款,货物运输,合同,模板
第三方非代收货款货物运输合同模板
XXXXO2O平台协议书|O2O平台协议书,O2O平台协议,xxxxo2o,平台,协议书
XXXXO2O平台协议书
《电子商务运营合作协议合同》|电子商务运营协议,电子商务运营合同,合作协议合同,电子商务,运营,合作,协议,合同
《电子商务运营合作协议合同》
签证服务协议|签证服务协议,签证服务,协议
签证服务协议
劳务中介服务合同|劳务中介服务合同,中介服务合同,劳务服务合同,劳务,中介服务,合同
劳务中介服务合同
境外劳务派遣和雇用合同|境外劳务派遣,境外劳务雇佣,境外劳务派遣合同,境外劳务雇佣合同,境外,劳务派遣,雇用,合同
境外劳务派遣和雇用合同
国外劳务合同|国外劳务合同,劳务合同,国外,劳务合同
国外劳务合同

历史上的今天:04月20日

职场中如何正确向上司汇报工作

职场中如何正确向上司汇报工作向上司汇报工作是职场中必不可少的一项工作内容,如何正确地向上司汇报工作,让上司更加了解自己的工作内容和进展,以及让上司给予更多的指导和支持呢?以下是一些向上司汇报工作的技巧:准备充分的汇报材料在向上司汇报工作之前,要准备好充分的汇报材料,包括工作计划、工作进展、工作成果等。这样可以让上司更加全面地了解工作的情况,并做出更准确的决策。突出工作重点在汇报工作时,要突出工作的

职场工作中10句话永远不要说

职场工作中10句话永远不要说作为一名职场人,以下10句话是永远不要说的,以免给自己带来不必要的麻烦或者减分:"我不行"。不要轻易说出这句话,因为这会让人感到你没有自信或者不愿意尝试新事物。"这不是我的工作"。如果你在工作中出现了问题,不要把责任推给其他人,这样会让人感到你不负责任。"我需要帮助"。如果你需要帮助,不要害怕开口,但也不要过度

职场上靠不靠谱,只用看这几个特征

职场上靠不靠谱,只用看这几个特征在职场中,一个人的可靠程度往往是被考察的重点。以下是一些可以判断一个人是否靠谱的特征:信守承诺:一个靠谱的人会信守自己的承诺,他们不会轻易做出承诺,但是一旦承诺了,就会尽全力去兑现。可以依赖:一个靠谱的人会让人感到可以依赖,他们会在需要帮助时尽力相助,不会临时掉链子。不会随意承诺:一个靠谱的人不会随意做出承诺,他们会先进行深入的思考和评估,确保自己能够做到才会做出承

职场中的三大逻辑思维能力

职场中的三大逻辑思维能力职场中的三大逻辑思维能力分别是:批判性思维:能够对大量信息进行分析、评价和推理,从而作出明智的决策。创造性思维:能够创造性地思考和解决问题,提出新的思路和方案。问题解决能力:能够快速、准确地理解问题,并提出解决方案。这三种逻辑思维能力在职场中都非常重要,它们能够帮助你更好地处理信息、解决问题,并与同事和上级进行有效的沟通。职场中的三大逻辑思维能力是:坚持目标思维、坚持聚焦思

职场:如何摆脱这些有害的“新人思维”?

职场:如何摆脱这些有害的“新人思维”?在职场中,有一些不好的“新人思维”,会对自己的发展产生不利影响。以下是一些摆脱这些有害思维的建议:不要害怕犯错误,要学会从错误中学习并成长。不要轻易接受别人的观点和建议,要有自己的思考和判断。不要过于在意别人的评价和看法,要坚持自己的价值观和信念。不要害怕在工作中承担责任,要学会挑战自己并不断提高自己的能力。不要在背后说同事或者上司的闲话,要保持良好的职场氛围

热门专题

综合高中|云南综合高中,昆明综合高中,综合高中能考本一吗,综合高中和普通高中的区别,综合高中是什么意思,综合高中能参加全国统一高考吗,综合高中可以考哪些大学,综合高中的学籍是什么
综合高中
金诺幼儿园(春城路金诺幼儿园)|昆明官渡区幼儿园,幼儿园报名,官渡区幼儿园,春城路幼儿园,幼儿园招生,学前班,昆明幼儿园,金诺幼儿园,环城南路幼儿园,石井路幼儿园
金诺幼儿园(春城路金诺幼儿园)
卓越综合高中|卓越综合高中
卓越综合高中
云南综合高中|云南综合高中
云南综合高中
自考本科|自考本科有用吗,自考文凭,自考本科文凭,自考文凭有用吗,自考本科文凭有用吗,自考文凭承认吗
自考本科
昆明网站建设|昆明网站建设,昆明网站开发,昆明网站建设公司,昆明网站建设价格,昆明网站设计,昆明网站制作,网页设计,高端网站建设,高端网站设计
昆明网站建设
弥勒综合高中|弥勒综合高中
弥勒综合高中
小程序开发|微信小程序,小程序开发,小程序,小程序制作,微信小程序开发,小程序公司,小程序开发公司,分销,三级分销系统,分销系统
小程序开发

微信小程序

微信扫一扫体验

立即
投稿

微信公众账号

微信扫一扫加关注

发表
评论
返回
顶部