Construction and installation engineering subcontract
General contractor (Party A):
Address: Postal Code Telephone
Legal representative: position
Subcontractor (Party B):
Address: Postal Code Telephone
Legal representative: position
In accordance with the "Contract Law of the People's Republic of China", the "Measures for the Implementation of the General Subcontracting of Construction and Installation Projects" of the Ministry of Construction and the relevant provisions of the XX Document of the People's Government of the XX Municipality, this contract was signed by both parties and was strictly implemented.
Article 1 Project
First, the project name:
Second, the project location:
Third, the project number: Construction license number: _ business license number:
4. Subcontracted project scope and engineering volume (with budget)
V. The term of the subcontracted project starts on the day of the month and is completed on the day of the month.
6. Labor costs of subcontracted projects.
7. Party B enters the types of work and the number of people.
Article 2 Project settlement
According to the subcontracted project, the first month's advance living expenses will be calculated according to the number of contractors, and will be deducted at the next month's settlement. The project will be pre-contracted according to the acceptance of the project completed during the construction period (the extent must not exceed the completed amount). 80%) After the project is completed, it will be checked and accepted by both parties.
Article 3 Project Quality
Party A shall carry out technical disclosure and organization acceptance according to the national quality acceptance specifications and assessment standards. Party B shall carefully organize the construction according to the requirements of the construction drawings and specifications to ensure the quality of the project. If the quality is not up to standard, it must be reworked and repaired, and the loss of materials and materials shall be borne by Party B. If the quality of the project is inferior and cannot be saved, Party B shall be responsible for compensating for the loss of all materials.
Article 4 Safety Production
1. Party A shall make a safe disclosure of the project undertaken by Party B, put forward clear safety requirements, and conduct supervision and inspection. Party B must conscientiously implement the rules and regulations concerning safety construction, strictly abide by the safe operation procedures, and provide safe production facilities to Party A. Party B can only use it after passing the inspection. If there is any casualty accident during the construction due to violation of the above regulations, Party B shall be responsible for the loss.
2. Labor protection articles and live operating devices used by individuals, such as insulating gloves and rubber boots, shall be resolved by Party B. If Party B does have difficulties, it may propose a plan for use and Party A shall assist in the settlement.
3. In the course of construction, Party B shall be responsible for the fire accident caused by Party B's violation of fire regulations and regulations.
Article 5 Life Management
1. After Party B's workers enter the scene, the accommodation and food problems will be provided by Party A and the main cooking utensils (cauldrons, cages, hair dryers, large panels) shall be kept by Party B. If there is damage, the compensation will be compensated. The small scattered appliances are provided by Party B, and the domestic coal is provided by Party A in a quantitative amount.
2. The food and oil used for daily life shall be provided by Party B. Party A shall provide convenience in medical and health care. If Party B's workers have illness, they may seek medical treatment from Party A with the approval of their responsible person. The medical expenses shall be paid by Party B. Responsible for paying monthly.
Article 6 Unit price of subcontracted labor costs
1. Subcontracting of unit projects, each budgeted working day is yuan. The implementation of unilateral square meters of labor costs, per square meter.
Second, the internal plastering and subcontracting, to achieve high quality every working day of the yuan. The eligible cost per working day is RMB. A separate labor cost is applied for each square meter.
3. Each budgeted workday for a single sub-container and earthwork is yuan.
4. Every day of work is cleared.
5. All-day shutdowns, materials waiting, water cuts, power cuts, and clearing work days are yuan.
6. Water, electricity, heating, and sanitation projects, each budgeted workday (subcontracted by building number).
7. During the winter construction period (from December 1 to the end of February), the working day will be reduced by 10%. The unit price for the workday is yuan.
Eight, subcontracted project cost schedule (one to seven items can be listed)
Article 7 Material Supply Management
Party B shall set up a special person to handle the limit collection procedures for cement, steel, commodity components, hardware, linoleum, asphalt and special materials for water, electricity, heating and sanitation. Party B shall strictly follow the quality requirements and materials provided by Party A for construction. Party B shall bear the waste of materials used in the construction of Party B and the unreasonable excess of the quota. Party B shall use the materials according to the 垛 (heap) during the construction, so that the daily use will be cleared, the materials will be cleaned, and the site will be kept clean.
Article 8 Construction Machinery
First, the large-scale tools are the responsibility of Party A to ensure the use of the need.
Second, the manual operation tool is responsible for Party B.
3. Party B shall take care of the equipment that Party A is responsible for, and Party B shall be responsible for compensation if there is any loss.
4. The medium and small-sized machinery required for construction shall be equipped by Party A according to the construction plan. One machine shall be equipped with a driver to ensure the normal construction of Party B. Party B shall not allow unauthorized operation of the equipment (with its own machinery in accordance with relevant regulations).
Article 9 Site Management
1. Personnel of Party A and Party B shall strictly abide by the various management systems on the site and organize the construction under the unified leadership of Party A's on-site personnel. The two parties involved in the plan, schedule, and material supply shall cooperate closely to ensure smooth construction.
2. Party B shall educate construction personnel on compliance with laws and regulations, safety production and property protection, and designate special personnel to be responsible for on-site security work. It is strictly forbidden to steal on-site materials. If there is any illegal behavior in violation of the on-site management system, Party A has the right to take necessary Party B shall bear legal responsibility and be responsible for compensation for economic losses.
Third, the subcontractors should be relatively stable. Work signs should be worn at the construction site. Persons outside the contract are not allowed to enter and leave the site.
Article 10 Liability for breach of contract
1. Projects subcontracted by Party B shall not be subcontracted. In the course of construction, the inspection fails to meet the national acceptance specifications, and the quality of the project cannot be guaranteed. Party A has the right to terminate the contract and cause losses of rework, and Party B shall compensate.
2. After the contract is signed, neither party may arbitrarily change or cancel it without the consent of both parties. If Party B fails to cancel the contract unilaterally without Party A's consent, Party B shall compensate Party A for the economic losses caused by Party A's impact on the construction plan; if Party A cancels the contract midway, it shall compensate Party B for the economic losses caused thereby.
3. Party B must complete the construction period and quality requirements as stipulated in the contract. Otherwise, each time overdue, Party A shall reimburse Party A for overdue liquidated damages of _7% of the labor cost of the subcontracted project.
4. Party A and Party B shall not owe all kinds of payables for any reason, such as defaulting on non-payment, and repaying the default payment of overdue payment according to the bank's short-term loan interest rate.
Article 11 Supplementary Provisions
1. In the event of a dispute in this contract, both parties shall consult in time and the negotiation will not be completed. If it cannot be solved, it can be solved according to the following item (): (1) Applying for arbitration to the Economic Contract Arbitration Committee of the building where it is located, and (2) Prosecuting to the People's Court.
2. In the first instance of this contract, both parties shall hold one copy. The remaining copies are submitted for filing.
3. If it is required for forensic (notarization), it may go to the district or county administration for industry and commerce at the location where the building is located for notarization or notarization.
4. Other terms agreed by the parties:
1.
2.
Article 12 Contract attachments and validity period
First, the contract annex:
1. Project budget book;
2.
2. This contract shall become effective from the date of the seal of both parties, and shall expire after the completion of the project and settlement.
Total package unit: ________________________
Legal representative: ______________________
year month day
Subcontracting unit: ________________________
Legal representative: ______________________
year month day